Project team
- Developer: Blue Iris Investments S.A.
- Operator: Four Seasons Hotels and Resorts
- Architects: Nikos Valsamakis & Maria Valsamaki
- General Contractor: TERNA S.A.
- Interiors / F&B design: Wimberly Interiors (WATG) / Rockwell Group
- Landscape: Elli Pagkalou & Associates
- MEP: LDK
- Structural & Geotechnical Engineer: Penelis Consulting Engineers – concept to construction design, and support during construction
- Location: Kalo Livadi, Mykonos, Greece
Structural challenges and approach
- Building with stone, safely. True to Cycladic tradition, the architects wanted load-bearing stone walls. After comparing unreinforced and confined masonry under Eurocodes 6 and 8, Penelis adopted confined masonry: 30 cm dimensioned natural stone walls tied by reinforced-concrete columns and bond beams, with concrete slabs. The system is more ductile, more tolerant of variable workmanship and gives the architects more freedom with openings.
- Cutting into the rock. Thirteen boreholes and anchor pull-out tests revealed granite whose upper 2–6 m is heavily weathered. The earthworks were carried out in two stages: first the main road, central plaza and internal roads, with cuts deeper than 2.5 m held by permanent ground anchors and shotcrete and a micropile wall along the western boundary; then the local excavation of each plot, supported by conventional retaining walls.
- Walls that disappear. Most retaining walls were cast against the carved rock face and embedded in sound rock without conventional footings, then faced with local stone. Precise surveying and vertical pre-drilling ensured that foundation levels matched the densely built neighbourhoods exactly.
The finished resort hides its engineering: the village looks as if it has always been part of the hill.
Source: penelis.com